Calendar
The crop year, month by month
Ordered the way the work happens — from booking planting material in May to closing out in April — rather than January to December, which cuts the story in half. Dates are calibrated to the Mahabaleshwar–Panchgani belt, which carries most of the national crop; other growing regions shift the same sequence.

May
Plan
Decide the area and the cultivar, then book the runners.
- Fix how much you are planting and which cultivar it will be — the two decisions everything downstream depends on
- Book planting material now. Nurseries allocate their best material to repeat buyers first, and growers who ring in August get what is left
- If you are planting more than an acre, split the order across two nurseries so one bad batch cannot take the whole season
Watch for
Nothing in the field yet.
From a buyer’s side
No fresh Indian fruit. Frozen and pulp only.
June
Plan
Price the inputs while you still have leverage.
- Get written quotations for runners, mulch film, drip and punnets rather than working from last year's numbers
- At 22,000 plants to the acre, every rupee on the plant price moves the budget by ₹22,000 — this is the line worth negotiating hardest
- Plan rotation. Ground carrying a history of wilt or red stele is a decision to make now, not in November
Watch for
Nothing in the field yet.
From a buyer’s side
No fresh Indian fruit.
July
Monsoon
Fix the drainage. It is the highest-return job of the year.
- Drainage work while the rain is showing you exactly where water sits
- Phytophthora crown rot and red stele are water-driven diseases before they are anything else, and no spray compensates for a wet site
- Order packaging and confirm cold-chain arrangements before everyone else does
Watch for
From a buyer’s side
No fresh Indian fruit.
August
Prepare
Beds, organic matter, drip. Confirm the delivery date.
- Land preparation and bed forming — raised beds, so the ground sheds water rather than holding it
- Farmyard manure and basal dressing incorporated
- Drip laid and tested before the film goes down, not after
- Confirm the runner delivery window with the nursery and hold them to it
Watch for
Nothing in the field yet.
From a buyer’s side
No fresh Indian fruit.
September
Transplant opens
The planting fortnight starts. This is the decision you cannot undo.
- NHB gives the window for hilly areas as September–October; in practice growers here work to a narrower band inside it
- Inspect every delivery before you accept it: crowns 8–12 mm, roots white to cream and springy, two to three healthy leaves
- Turn ten plants over and check leaf undersides with a hand lens. Importing mite with your planting material is the most expensive avoidable mistake in the crop
- Plant early into warm soil and you get leaf instead of flower; plant late and the plant flowers on a frame too small to carry fruit. Neither is recoverable
Watch for
From a buyer’s side
No fresh Indian fruit. Buyers should be contracting now for the season ahead.
October
Establish
Get them rooted, and start looking at leaf undersides.
- Complete transplanting; establishment irrigation without overwatering
- Begin scouting properly — undersides of leaves, with a lens, not a glance at the canopy
- Decide your runner policy for the season: runners left on the plant compete with fruit, but they are also free planting material for next year
From a buyer’s side
No fresh Indian fruit yet.
November
First pick
First fruit, best prices — and the bloom that decides your fruit rot.
- First picks begin. Grade discipline starts here and sets your realisation for the whole season
- Target grey mould at bloom rather than reacting to rot on fruit later. The infection happens at flowering and stays latent
- Field-grade into the punnet the fruit will ship in; never tip out and re-sort
- Cool fruit quickly after picking — the difference between five days of shelf life and two
Watch for
From a buyer’s side
First fresh Indian fruit reaches the market. Prices at or near their annual high because almost nobody has any.
December
Peak
Volume arrives. Picking becomes a labour problem.
- Picking every second day at peak, by hand, by people who need training — plan this before you plant, not now
- Mite counts matter more than mite sightings: published guidance works to fewer than five per mid-tier leaflet early in the crop
- Keep the cold chain honest. Fruit that goes to market warm loses a grade in transit
From a buyer’s side
Volume building. Prices easing off the November high. Good month to contract against.
January
Peak
Highest volume, lowest prices, and everything depends on labour.
- Peak picking. Fruit left on the plant because you were short of hands is the most common avoidable loss of the season
- Scout leaf undersides for powdery mildew — by the time the top surface tells you, it is well established
- Mite thresholds rise later in the crop as plants tolerate more; published guidance allows 15–20 per mid-tier leaflet
From a buyer’s side
Cheapest fruit of the year. If you are buying volume for processing, this is the window.
February
Peak tapering
Warmer weather brings anthracnose forward.
- Anthracnose becomes the fruit rot to watch as temperatures rise; grey mould was the bloom-time problem, this is the warm-weather one
- Remove infected fruit from the field rather than dropping it between beds — it is inoculum for the next round
- Start assessing which plants you would multiply from, if you are propagating your own
Watch for
From a buyer’s side
Volume falling, prices firming again.
March
Closing
Last fruit, and prices climb back.
- Final picks. The belt is finishing and the fruit still coming is worth more than January's
- Decide now whether next season's planting material is bought or multiplied — and if multiplied, from which plants
- Virus load accumulates across self-propagated generations. Refresh from certified stock every second season at minimum
Watch for
From a buyer’s side
Last fresh Indian fruit. Prices high again on scarcity.
April
Close out
Write down what actually happened.
- Crop removal, or runner multiplication if you are propagating
- Record the numbers while they are fresh: actual yield, actual grade split, what the disease pressure was and when
- That record is what makes next year's budget real rather than a repeat of a published model
Watch for
Nothing in the field yet.
From a buyer’s side
Season over. Frozen and pulp only until November.
Read this properly
These are boundaries, not dates. Elevation moves them across the plateau, a late monsoon moves the whole sequence with it, and growing regions outside the Deccan — Bihar, Himachal, the Nilgiris — run their own calendars on the same logic rather than these months. The planting window is NHB’s published guidance, the harvest window and peak are the established season, and the disease timing and mite thresholds follow the extension sources cited on the disease pages.
What you will not find here is a fertigation schedule or a spray programme with dates on it. Those depend on your soil, your cultivar and your season, and publishing them as a calendar would be inventing precision we do not have.
Planning procurement around this?
Tell us the window you need fruit in and we’ll tell you what the belt can realistically hold to.
